top of page
Search
  • Writer's pictureNACT

Pepsi / Gatorade

Type of Repair: Production Facility, Seamless Floor Systems


Outline of Work Performed: Removed and replaced 4000 sq. ft. in mixing/blending room

Products Installed:  Urethane Cement



Results:  Work was started Friday evening and completed by 10 pm Sunday which enabled the plant to open on-time Monday morning.

8 views0 comments

Recent Posts

See All
bottom of page